Tuesday, 03 November 2009
A job in Haddonfield includes the removal of a center bearing wall with a span of 16'. The two end bearing points include one end over the house foundation wall and the other end which will require the relocation of a steel lolly column. To install and support the column we cut and dug a 24" x 24" x 12" footing complete with steel rebar. We will then fill this footing with 5000 P.S.I. concrete.