Thursday, 27 August 2009
John and Harvey are working the concrete during the pouring process. The finished height is finished according to the grading stakes located within the footings.
Thursday, 27 August 2009
After the excavation is completed, forms are installed for the footings. Rebar is used to connect with the existing foundation and for strength. The footings are inspected by the local building inspector.
Thursday, 27 August 2009
The framing continues with the walls and roof sections. Notice that we use a continuous header on the walls since the sunroom will feature numerous windows, transoms and lower lattice sections.
Tuesday, 25 August 2009
After the floor framing inspection, the Trex decking is being installed in the three season sunroom. Each piece of Trex is screwed to the framing for a higher quality installation.
Monday, 24 August 2009
Bob and John are completing the framing of the floor. All pressure treated lumber is required in the framing, which will be inspected by the local building inspector for approval.
Saturday, 22 August 2009
The master bathroom addition is being added to the existing bedroom area. Bob our backhoe operator, John and Harvey are performing the excavation on this foundation. Objects like the central air conditioner and the underground irrigation pipes had to be relocated.
Friday, 21 August 2009
In these two photos are our employees John and Harvey, whom are both lead carpenters, and have years of experience in foundation construction.
The foundation will supply structured support for the addition. Later, brick will be installed around the concrete block to match the existing brick on this home. After the foundation is complete, the local building inspector will examine the foundation and compliance for proper venting before we begin framing construction.
Tuesday, 18 August 2009
Pictured is the rear on the home and the start of the excavation process. Harvey and Bob, lead carpenters and Tom, company owner have laid out the footings according to the approved architectural plans.
Bob is the operator of the backhoe and Harvey hand finish the footings. Tom supervises the process and checks for proper footing specifications.
The footings when completed will be inspected by the local building inspector prior to the delivery of concrete.
Monday, 17 August 2009
Pictured is Bob, one of our lead carpenters. Bob has finished the decking, handrails and staircase on this project. This deck features the latest in no maintenance Trex products, low voltage accent lighting with staircase riser lights.
After all final inspections by the local building inspection official, this deck will host many family and friendship events.
Wednesday, 05 August 2009

Trex Deck
Pictured is John D., one of our Lead Carpenters. John and Bob have completed the deck framing and now are installing Trex decking products.
Monday, 03 August 2009

Grouting Tile
Pictured is our employee Al, who is a Lead Carpenter and an expert on drywall installations and finishings. Al is grouting the tile at Sharon's bathroom. After the grout is completely dry, we will then seal the entire tile and grout surfaces to prevent mold and mildew.

|
|