Blog 
Monday, 28 September 2009


The local building inspector approved the footings and we were able to pour the foundation with concrete.  After the concrete set, John D. and Harvey completed the foundation with block, and new pressure treated sills.  When the foundation is completed the temporary beam supports can be removed.
POSTED BY: GKS AT 08:22 am   |  Permalink   |  0 Comments  |  E-mail this